• JohnnyEnzyme@piefed.social
    link
    fedilink
    English
    arrow-up
    9
    ·
    1 day ago

    Sand of various types are running out around the world, and it can be quite the expensive challenge to get the right type for your particular project, many times involving trying to preserve land from water erosion.

    Maybe industry is working to create artificial sand grades for current and future projects, I’m not sure…

    • yermaw@sh.itjust.works
      link
      fedilink
      arrow-up
      5
      ·
      1 day ago

      Thats pretty shocking to my untrained ass. I always assumed they did mass-produced sand, grinding up their own stones and stuff.

      • sparkyshocks@lemmy.zip
        link
        fedilink
        arrow-up
        5
        ·
        1 day ago

        River sand is the right amount of jaggedness to where it can pour and settle into the right density in cement to have the right strength in the finished concrete. Ocean/beach sand works, too, but needs to be rinsed with fresh water, and is usually pretty valuable where it is (for beach resorts and what not).

        They’re testing for how to use different types of sand (desert sand, manufactured sand, recycled sand) and testing the pouring characteristics and resulting concrete strength, so that they can make reasonable decisions on when it’s worth using substitutes.

        • fruitycoder@sh.itjust.works
          link
          fedilink
          arrow-up
          1
          ·
          11 hours ago

          Civil engineering really is just the study of concrete isn’t it

          No shade, just amazed I’m always nearing more about concrete lol

          • sparkyshocks@lemmy.zip
            link
            fedilink
            arrow-up
            1
            ·
            11 hours ago

            Yeah, one of the issues I’ve read about happening for concrete failures was that some construction crews are under enormous pressure to salvage concrete that had been mixed too early, or delayed in pouring, or whatever, and where the concrete pouring characteristics cause issues (or crews add unauthorized water or things to slow down curing and then alter the characteristics of the poured concrete without the engineers’ awareness).

            It’s wildly counterintuitive to those of us who don’t work in the space.