In IT, some weeks are super busy, but as I’ve improved things at work (upgrading equipment, fixed old issues, automated some repeat processes, etc), there are other weeks it’s “slow” and I feel like I’m just sitting there. It used to be nonstop all the time when I was new, but the were a lot of unresolved problems or things the last guy didn’t know how to do. I probably couldn’t get away with 3x 8 hour days as stuff will always happen unexpectedly, but still. It would be less of a problem if I could go back to working remote at least partially. Going onsite everyday is also annoying AF.
In IT, some weeks are super busy, but as I’ve improved things at work (upgrading equipment, fixed old issues, automated some repeat processes, etc), there are other weeks it’s “slow” and I feel like I’m just sitting there. It used to be nonstop all the time when I was new, but the were a lot of unresolved problems or things the last guy didn’t know how to do. I probably couldn’t get away with 3x 8 hour days as stuff will always happen unexpectedly, but still. It would be less of a problem if I could go back to working remote at least partially. Going onsite everyday is also annoying AF.