cross-posted from: https://mander.xyz/post/44925200

The fire that broke out on a bridge across the Teltow canal in the south-west of the capital early on Saturday could deprive up to 35,000 homes and 1,900 businesses of electricity – and in many cases heat – until 8 January, the grid company Stromnetz Berlin said.

As state security authorities opened an investigation into the cause of the blaze near the Lichterfelde heat and power station that damaged several high-voltage cables, the Vulkangruppe (Volcano Group) said.

The area affected by the power cut includes many elderly care homes and hospitals as well as high-rise buildings with residents who are reliant on elevators that are now out of order. Berlin received moderate snowfall at the weekend and night-time temperatures plunged well below freezing.

A previous arson attack attributed to the far left in September knocked out electricity for 60 hours in the south-east of the city in what was reportedly Berlin’s longest power cut since the second world war.

Archive link

  • AmidFuror@fedia.io
    link
    fedilink
    arrow-up
    7
    arrow-down
    6
    ·
    3 days ago

    Lol at the people here struggling to justify this.

    Honestly, I was expecting more claims the people doing it were technically far right because leftists can’t be bad guys.

    • knowone@slrpnk.net
      link
      fedilink
      English
      arrow-up
      6
      ·
      3 days ago

      There are people here trying to justify this? I can’t find a single comment that is

      • Takapapatapaka@tarte.nuage-libre.fr
        link
        fedilink
        Français
        arrow-up
        2
        ·
        3 days ago

        People are pointing out some aspects this group revendicates : it targeted a neighbourhood with many rich people, they apologized for every struggling people affected by this, they used the same tactic against Tesla factory. Don’t know what to think about it, those are just the comments of people that seem a bit knowledgeable about the situation.