I’ve never been a fan of this idea, it doesn’t go far enough and further makes things less symmetric/divisible. I say we use 6-day weeks, 5 weeks per month, 12 months per year, and an inter-calary holiday week of 5-6 days. A six day week means 4 days working, 2 days rest, and that can be staggered more easily/equitably assuming work needs full coverage in a week. We start the new year on the Spring Equinox because it’s generally more pleasant.
For bonus points, we switch to base-12 (or dozenal) in our numbering system because after the transition it’s a much easier system to deal with as far as division and multiplication is concerned (e.g. 1/4 would be .3 instead of .25, 1/3 is .4 instead of .333…, 1/2 is .6, etc.).
I’ve never been a fan of this idea, it doesn’t go far enough and further makes things less symmetric/divisible. I say we use 6-day weeks, 5 weeks per month, 12 months per year, and an inter-calary holiday week of 5-6 days. A six day week means 4 days working, 2 days rest, and that can be staggered more easily/equitably assuming work needs full coverage in a week. We start the new year on the Spring Equinox because it’s generally more pleasant.
For bonus points, we switch to base-12 (or dozenal) in our numbering system because after the transition it’s a much easier system to deal with as far as division and multiplication is concerned (e.g. 1/4 would be .3 instead of .25, 1/3 is .4 instead of .333…, 1/2 is .6, etc.).