• antimongo@lemmy.world
    link
    fedilink
    arrow-up
    36
    ·
    edit-2
    6 hours ago

    Power company engineer here, it’s true that a lot of our supporting and analytics software went down during the AWS event.

    However, most devices that actually control grid units (called bulk electric system cyber-assets) are air-gapped or utilize a data diode.

    FERC Reliability Standards and NERC CIP

    However-er, flipping through those standards just now, turns out it’s 100% permitted to connect your “bulk electric system cyber-asset” to a cloud integration if done compliantly.